UCB | Project Apple

Project Apple seeks to create a research and development (R&D) centre of excellence for the global pharmaceutical company UCB, relocating its UK-based Early Discovery facilities from Slough to Windlesham.

We were brought in to develop and manage the programme of the full M&E package, including Design, Procurement, Construction, and Commissioning phases.

Stronelairg Onshore Wind Farm

The 228MW Stronelairg onshore wind farm sits at an elevation of around 600 meters above sea level. Its load factor, on a P50 basis, is expected to be around 42% in a typical year, which is claimed to be like the load factors of several existing offshore wind farms.

We managed the construction planning for the installation contractor.

Greenlink Interconnector

Greenlink is a subsea and underground electricity interconnector that links the power markets in Ireland and Great Britain, representing one of Europe’s most important energy infrastructure projects.

We were brought in to produce the baseline programme in the pre-construction phase and manage the programme across the duration of the project.

HS2 Main Works C2-C3

hs2

A major contractor needed assistance with data management and reporting improvements. We established a roadmap and then delivered rolling upgrades to their systems.

Small Modular Reactor Programme

small modular reactor

Our client is designing and bringing to market small modular nuclear reactors. We provided a range of services within the PMO, including planning, project controls, and development of digital tools.

Digital Transformation Initiative: Shepherdess Walk Office Development

We implemented a digital transformation initiative for a leading main contractor with £1B turnover as part of their overall digital transformation strategy. Our solution was entered by our client into BCIA Awards – Digital Transformation Initiative of the Year and was subsequently short listed as a finalist.